ALTON CONSERVATION COMMISSION
NOTICE OF MEETING
ALTON TOWN HALL
March 13th, 6 PM
Agenda
Members:
Gene Young, Chairman Dana Rhodes, Vice Chairman Russ Wilder
Tom Diveny David Mank Tara Lamper, Alternate
Andrew Morse, Selectman’s Rep
Others Present:
Members Absent:
Call Meeting to Order:
Approval of Agenda:
Presentations/Consultations:
- Bree Rossiter of the Lake Winnipesaukee Alliance, water samples from the brooks flowing into the Bay on the East and West sides
- Scott Berkely from LRCT , transfer of the Gould property from the Audubon Society to LRCT
Approval of Minutes:
- Minutes of 2/27/25 meeting
PERMITS AND APPLICATIONS
(Any permit or application that has been signed off by the Chair or Vice-Chair is
entered here for the record, unless any Commissioner has questions or comments)
Planning Board/ZBA Department Head Review Agenda Items:
1) P25-07, Prospect Mountain Survey, Paul Zuzgo, Agent for Bruce Campagna and Nancy Bell, Owners, M49 L 32&32-1 - To adjust lot lines for two (2) lots of record, with Map 49 Lot 32 adjusted from .27AC to .46AC, and Lot 32-1 adjusted from 1.29AC to 1.09AC. – No concerns, signed by Gene Young 2/28/25
2) P25-08, Norway Plains Associates, Steve Oles, Agent for Hertel Investment Properties, LLC & Richard Lundy, Owners, Map 15 Lots 9-3 & 9-3-1 NH Rte 28/Hogdon Rd/ Miramichie Hill Rd- To adjust lot lines for two (2) lots of record, with Map 15 Lot 9-3 adjusted from 5.34AC to 4.329AC, and Lot 9-3-1 adjusted from 2.978AC to 3.989AC. – No concerns, Signed by Gene Young 3/3/25
3) P25-09, Jones & Beach Engineers, Inc., Barry Gier, Agent for Overlook Properties, Owners, M9 L6-1 Suncook Valley Road – Final major site plan to construct seven(7) self storage buildings containing forty-four(44) 20’x48’units. – No concerns, signed by Gene Young 2/28/25
4) P25-10, Prospect Mountain Survey, Paul Zuzgo, Agent for Scott and Penny Williams, Owners, Map 8 Lot 3-2 Frank C. Gilman Hwy – Final major subdivision to subdivide the Parent Lot of 95.35AC into three(3) Lots of record with the parent lot being 91.32AC and the two(2) new lots being 2AC each. – No concerns, signed by Gene Young 2/28/25
Wetland Permit by Notification (PBN):
Expedited Minimum Impact Wetlands Application:
Standard Wetlands Dredge and Fill Applications:
1) Standard Wetlands- William Friece, 244 Sleepers Island M74 L35 -The work consisted of removing the boathouse structure which also served as a large, elevated deck accessible from the second story of the house. Several wood deck walkways along the sides of the boathouse and leading to an adjacent dock were also removed. These structures can clearly be seen in the first photograph included in Attachment 2. The permitted dug-in basin, approximately 12’ x 26’ in size, was then filled in to restore the upland that existed prior to the work being conducted under the 1977 permit. A vertical boulder retaining wall was constructed to re-establish the original shoreline across the former basin and around its southeast corner where the bank had been compromised. A geotextile lining was added behind the wall to prevent washout and the interior area of the wall was backfilled using clean rock. The rock used for the backfill and the wall was imported to the island for this purpose. The surface of the filled in permitted basin was finished using sand, consistent with the adjacent areas on the property. The project involved a total of 26 linear feet of temporary bank impacts for the wall and 312 square feet to fill the basin.
Shoreland Permit Applications:
1) Shoreland Permit Application – Regan Family Rev Trust, Robert D & Erica L Regan Trustees, 45 Indian Shore Road M62 L2 – The proposed project includes removal of old house down to the foundation, removal of garage, removal of non-approved pervious paver areas. Construct a new house on existing foundation, construct new garage, new driveway and replace 683 sf of gravel area back to natural woodland state.
2) Shoreland Permit Application - Thomas Nahill Rev Trust & Robin Nahill Rev Trust, 16 Lionel Terrace M40 L2-1 - Reduce the existing gravel access footprint and improve to create a permanent driveway. Construct pervious patios and stepping stone walkways, install stone steps and reconstruct the walkway to the dock. Place boulders and install native plantings to naturalize the landscape, install a stone drip edge under the roof overhang.
Shoreland Permit By Notification (PBN):
Reoccurring/Unfinished Business & Projects:
1) Water Quality Monitoring Program
• Halfmoon Lake Current Year Water Results
2) Property Management, Monitoring, and Reports
3) Budget
4) Future conservation opportunities
5) C.C Master Plan Action Items
New Business:
Commissioner Reports:
Chairman Report
Vice Chair Report-
Member Reports-
Notice of Intent to Cut Timber:
Correspondence:
Date and time of next meeting:
March 27th, 2025 @6pm
Adjournment: