The following information is provided for your assistance. Please review the building or sign permit application form or contact the land use office with questions regarding your specific project.
Building, Plumbing, Electrical, Well, Septic, Driveway, Right of Way and Sign Permit Applications are available in the Building Department in the Town Hall. (875-2164)
Applications that are complete and in compliance with the Ordinances and Regulations are usually processed within 7 - 10 business days. Please contact the Building Official or his office within this period of time for verification of its issuance.
Application must be printed or typed and be complete and legible. Applicant or their agent is responsible to assure that all information in the application is correct.
Building Plans are required and all plans and construction must be in compliance with all State of NH Codes and Regulations as well as those adopted by the Town of Alton.
Permits expire if not substantially acted upon within 9 months or if construction activity ceases.
Applicant or their agent is required to call the Building Inspector for all required inspections (footings, foundation, framing, rough plumbing, gas piping, rough electrical, insulation and final).
A Plot Plan shall be included as part of the application. It shall be neatly drawn and include the following information.
- North arrow
- Boundaries of lot with dimensions in feet.
- Setback distances from structures to all property lines. Please remember that the front setback is measured from your property line, not from the road. (In campgrounds and mobile home parks, indicate setback to nearest structures and roads on all sides from both the existing and proposed structure.)
- Setback distances from all bodies of water and wetlands.
- Names and locations of roads adjacent to lot.
- Location of all driveways. Identify if existing or proposed. Driveway application must be completed for proposed new driveways and change of use or expansions of existing driveways.
- Existing structures on lot: include septic system, drainage structures, wells and utilities.
- Sketch all proposed structures and additions showing overall dimensions.
- Height in feet of proposed construction.
- Location of any wetlands, floodplain, streams, etc. on site.
- Location of any on-site or adjacent cemeteries or burial sites
- Any additional information that will adequately describe the proposed work
Failure to submit a completed Plot Plan will delay processing of your application. Plan must be in ink and legible.